Thứ Năm, 27 tháng 4, 2017

Patent Prosecution Highway Mechanism Between Vietnam and Japan

First pilot program between Vietnam National Office of Intellectual Property (NOIP) and Japanese Patent Office (JPO)

NOIP and JPO have jointly undertaken the first Pilot Patent Prosecution Highway program (“PPH”) since 01st Apr, 2016.
According to this bilateral PPH, the patent application filed at JPO (previously filed at NOIP) falling into one of the three following cases:
(i)     An application which validly claims for priority under the Paris Convention on the basis of NOIP application(s), or
(ii)     A PCT national phase application to Japan without priority claim, or
(iii)   An application which validly claims for priority under the Paris Convention to the PCT application(s) without priority claim.
And meeting other conditions regulated in Procedures guidance to file a request to JPO for PPH program between JPO and NOIP (“Procedures”), the applicant shall be entitled to request JPO to fast prosecute the application on the basis of providing research and evaluation results of NOIP and other relevant documents to JPO for references.
For the patent application filed at NOIP (previously submitted to JPO) falling into one of the three following cases:
(i)     An application which validly claims for priority under the Paris Convention on the basis of JPO application(s), or
(ii)     A PCT national phase application to Vietnam without priority claims and this PCT submitted to JPO as an international application receiving agency (applications’ number initiating with PCT/JP hereby referred to as “PCT/JP applications”), or
(iii) An application claims for priority under the Paris Convention on the basis of PCT/JP application(s) without priority claims;
And meeting other conditions regulated in the Procedures, the applicant shall be entitled to request NOIP to fast prosecute the application on the basis of providing research and evaluation results of JPO and other relevant documents to NOIP for references. The duration of the PPH program shall be expired by the date of March 31st, 2019.




0 nhận xét:

Đăng nhận xét